| Definition Type: | Element |
| Name: | calculationPeriod |
| Namespace: | http://www.fpml.org/2003/FpML-4-0 |
| Type: | nsA:CalculationPeriod |
| Containing Schema: | fpml-ird-4-0.xsd |
| MinOccurs | (1) |
| MaxOccurs | unbounded |
| Abstract | |
| Documentation: |
The parameters used in the calculation of a fixed or floating rate calculation period
amount. A list of calculation period elements may be ordered in the document by ascending
start date. An FpML document which contains an unordered list of calcularion periods
is still regarded as a conformant document.
|
![]() |
|
|
|||||||||||||||||||||||||||||||||||||||||
|
|||||||||
|
|