Definition Type: Element
Name: spotDate
Namespace: http://www.fpml.org/2007/FpML-4-4
Type: fpml:IdentifiedDate
Containing Schema: fpml-riskdef-4-4.xsd
MinOccurs 0
MaxOccurs (1)
Abstract
Documentation:
The spot settlement date for which the structure applies, normally 0-2 days after the base date. The difference between the baseDate and the spotDate is termed the settlement lag, and is sometimes called "days to spot".
Collapse XSD Schema Diagram:
Drilldown into id in schema fpml-shared-4-4_xsd Drilldown into IdentifiedDate in schema fpml-shared-4-4_xsdXSD Diagram of spotDate in schema fpml-riskdef-4-4_xsd (Financial products Markup Language (FpML®))
Collapse XSD Schema Code:
<xsd:element name="spotDate" type="IdentifiedDate" minOccurs="0">
    <xsd:annotation>
        <xsd:documentation xml:lang="en">The spot settlement date for which the structure applies, normally 0-2 days after the base date. The difference between the baseDate and the spotDate is termed the settlement lag, and is sometimes called "days to spot".</xsd:documentation>
    </xsd:annotation>
</xsd:element>
Collapse Child Attributes:
Name Type Default Value Use
id fpml:id (Optional)
Collapse Derivation Tree: